f #2

Open
finkregh wants to merge 3 commits from f into main
Owner
No description provided.
feat: catch no files
Some checks failed
/ Determine versions (pull_request) Failing after 5s
/ Unittests and try build -- Python 3.13 (pull_request) Has been skipped
/ build-container (pull_request) Has been skipped
355ba177a3
finkregh force-pushed f from 355ba177a3
Some checks failed
/ Determine versions (pull_request) Failing after 5s
/ Unittests and try build -- Python 3.13 (pull_request) Has been skipped
/ build-container (pull_request) Has been skipped
to 605c5bef2a
Some checks failed
/ Determine versions (pull_request) Failing after 5s
/ Unittests and try build -- Python 3.13 (pull_request) Has been skipped
/ build-container (pull_request) Has been skipped
2026-05-29 07:58:06 +00:00
Compare
fix(ci): cleanup
Some checks failed
/ Get release information (pull_request) Failing after 1s
/ Unittests and try build -- Python 3.13 (pull_request) Has been skipped
/ build-container (pull_request) Has been skipped
7d3f4af062
Some checks failed
/ Get release information (pull_request) Failing after 1s
/ Unittests and try build -- Python 3.13 (pull_request) Has been skipped
/ build-container (pull_request) Has been skipped
This pull request can be merged automatically.
You are not authorized to merge this pull request.
View command line instructions

Checkout

From your project repository, check out a new branch and test the changes.
git fetch -u origin f:f
git switch f

Merge

Merge the changes and update on Forgejo.

Warning: The "Autodetect manual merge" setting is not enabled for this repository, you will have to mark this pull request as manually merged afterwards.

git switch main
git merge --no-ff f
git switch f
git rebase main
git switch main
git merge --ff-only f
git switch f
git rebase main
git switch main
git merge --no-ff f
git switch main
git merge --squash f
git switch main
git merge --ff-only f
git switch main
git merge f
git push origin main
Sign in to join this conversation.
No reviewers
No labels
No milestone
No project
No assignees
1 participant
Notifications
Due date
The due date is invalid or out of range. Please use the format "yyyy-mm-dd".

No due date set.

Dependencies

No dependencies set.

Reference
finkregh/zfs-estimator!2
No description provided.